Tunnel Ventilation Fans Activation Schedules

Tunnel Ventilation Fans (TVFs) are installed near certain MRT stations along the North-South and East-West Lines to provide air movement in MRT tunnels. 

TVFs are used primarily for:
  1. Maintenance works in the tunnels during non-revenue hours. These include works such as tunnel washing, rail welding and rail grinding.
  2. Emergency situations when commuters are evacuated from the tunnel to the nearest station platform.
 
The powered ventilation is necessary for the health, safety and comfort of our workers in the tunnel as the TVFs remove elements such as smoke, heat and dust generated during the maintenance works. 
 
We have made every effort to minimise noise and any inconenience caused to neighbouring residential and commercial areas.
 

Please watch this space for the latest schedule:

Item No

Affected Stations

Date

Time

1 Newton - Novena 7 Jan 2019 0100 - 0430 hrs
2 City Hall - Dhoby Ghaut  9 Jan 2019
11 Jan 2019
0100 - 0430 hrs
3 Bishan - Somerset 10 Jan 2019 0100 - 0430 hrs


 


 

 